Greengill Farm AD Plant, Penrith Cumbria
Construction of a 2.4MW Plant
- 50m – 30m digester in-situ tank x 8m deep with an in-situ concrete lid
- 48m Diameter in-situ concrete tank 8m deep
- 10m diameter reception tank
- Single story in-situ concrete CHP house
- Pump house and tunnel
- Feeder base
- Crane hire
Client: Greengill Farm AD Plant
Date: April 16 – November 16